Infrastructure Works for Reclamation of Zone K & L (400,000 Feddans), Dabaa Corridor, Future of Egypt Mega Project

Construction

El Dabaa Corridor, Egypt.

PROJECT OVERVIEW

The contract combines the construction of all networks & pumping stations to irrigate 400,000 feddans.

Scope of works includes all civil, architectural finishing, electromechanical, infrastructure, landscape, and road works.

Networks to be installed under this contract include the following:

  • Prestressed pipeline length 29 km in diameter (1200mm to 2500mm)
  • Steel pipeline length 148 km in diameter (1200mm to 3000mm)
  • HDPE pipeline length 255 km in diameter (200mm to 1000mm)
  • UPVC pipeline length 300 km in diameter (200mm to 315mm)

Owner

Future of Egypt for Sustainable Development Authority

Engineer

Hydro., Envir. & Infra str. Studies